VORON 1.5: Installing frame & motors + first problem
- by Tom Beyer
- 2017-02-15
- 3D Printing
Today I finally installed the frames and mounted the motors.
Also wanted to mount the A&B idlers but unfortuneately the steel dowels have an diameter of 5mm and the inner diameter of the flanged bearings have an inner diameter of 4,96mm.
Already ordered new dowels with a diameter of 4mm. I updated the BOM acordingly.