VORON 1.5: Installing frame & motors + first problem



Today I finally installed the frames and mounted the motors.

Also wanted to mount the A&B idlers but unfortuneately the steel dowels have an diameter of 5mm and the inner diameter of the flanged bearings have an inner diameter of 4,96mm.

Already ordered new dowels with a diameter of 4mm. I updated the BOM acordingly.

IMG 20170215 210520 IMG 20170215 210532 IMG 20170215 210538 IMG 20170215 210752 IMG 20170215 210858 IMG 20170215 211106 IMG 20170215 211131 IMG 20170215 212431 IMG 20170215 213703 IMG 20170215 213725 IMG 20170215 213749 IMG 20170215 215610 IMG 20170215 215625 IMG 20170215 215841


Comments